About the Client
Mitek is an international company specialising in engineered building solutions, particularly structural connectors and software for the construction industry.
Their presence at Worcester Six Business Park (WR4) represents a modern office and operational hub designed to support innovation, collaboration, and high-performance working environments.
The Requirements
The project brief required the installation of a premium solar shading solution tailored for a modern office environment.
Key requirements included:
•Effective glare reduction for screen-based workspaces
•Maintaining natural daylight while ensuring visual comfort
•A clean, professional finish aligned with a high-spec office fit-out
•Compliance with fire safety standards (FR fabric)
•A solution suitable for large glazing areas, including high-drop installations
•Reliable and smooth manual control system throughout
•Supply and installation of 115 roller blinds
•Installation across:
•Ground Floor
•First Floor
•Second Floor
•Manual control systems throughout
This project involved several critical challenges:
•Reception area exposed to intense direct sunlight
→ Strong glare affecting visibility, particularly around the staircase
→ Required installation of 3.6m drop blinds to control light effectively
•Drywall-only fixing conditions
→ No access to structural fixing points
→ Required specialist heavy-duty toggle (umbrella) fixings to ensure safety and durability
•Tight installation programme
→ Completion of 115 roller blinds in just 2 days
→ Required high efficiency without compromising quality
•Consistency across multiple floors
→ Main
Iris Blinds LTD delivered a tailored and efficient installation strategy:
•Installed a manual roller blind system using R20 sidewinder mechanism (chain-operated)
•Selected ROE 3% screen fabric (Fire Retardant) to balance:
•Glare control
•Daylight penetration
•External visibility
•Used professional-grade drywall fixings (toggle anchors) for secure and long-lasting installation
•Delivered a consistent, high-quality finish across all floors
•Carefully handled large drop blinds (3.6m) in reception for maximum performance and visual impact
The result is a smart, comfortable, and high-performing office environment:
•Significant reduction in glare, improving working conditions
•Maintained clear external visibility and natural light
•A clean, uniform installation enhancing the overall interior design
•Successful delivery within a tight 2-day installation programme
•Durable and secure solution despite challenging installation conditions